People Mover Venezia
Venice, Italy
Project Start Date: June 2006
Start of Operations: April 2010
As a fully integrated element of the public transportation network, Doppelmayr´s Cable Liner Bypass® carries passenger to the heart of the city Venice. The new construction is a convenient connection between the island Isola del Tronchetto and Piazzale Roma. An intermediate station at Porto Marittima includes future hotel infrastructure and a port for cruise ships.
Length | 850 m (2,789 ft) | |
---|---|---|
Configuration | Cable Liner® Bypass | |
Operating Speed | 28.8 km/h (17.9 mph) | |
Headway | 240 s | |
Dwell Time | 30 s | |
Guideway | Elevated steel girder | |
System Capacity | 3,000 pphpd | |
Stations | 3 | |
Trains | Two 4-car trains | |
Train Capacity | 200 passengers/train |
- Pollution reduced system enhances accessibility to center of Venice
- Link between Tronchetto island and Piazzale Roma
- Parking facilities under construction
- Switch and Bypass function